Alabama Warrior Railway: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
m (Typo)
No edit summary
Line 5: Line 5:


==References==
==References==
* Cooper, Lauren B. (August 11, 2009) "New railroad line added to serve Warrior's Walter Coke foundry." ''Birmingham Business Journal''
* Cooper, Lauren B. (August 11, 2009) "New railroad line added to serve Warrior's Walter Coke foundry." {{BBJ}}


==External links==
==External links==
Line 11: Line 11:


[[Category:Railroads]]
[[Category:Railroads]]
[[Category:2009 buildings]]
[[Category:2009 establishments]]
[[Category:Warrior]]
[[Category:Warrior]]

Revision as of 11:30, 16 March 2014

Alabama Warrior Railway logo.jpg

The Alabama Warrior Railway (ABWR) is a short line railroad serving the Walter Coke, Inc. coking plant in Warrior. The 15-mile railway absorbed the former Mary Lee Railroad. The project was completed in 2009 by Watco Transportation Services.

The railway makes connections from the plant to BNSF, Norfolk Southern and CSX Class I rail lines and also provides rail access to LaFarge, U. S. Pipe, Cemex, Harrison Gypsum and Performance Miners in Birmingham.

References

External links