Wylam K-8 School: Difference between revisions

From Bhamwiki
Jump to navigation Jump to search
mNo edit summary
No edit summary
Line 23: Line 23:


Under the most recent school consolidation plan proposed by acting superintendent [[Barbara Allen]] and approved by the Board, Wylam Elementary would accept students from [[A.G. Gaston K-8 School]] after the [[2011]] school year. [http://blog.al.com/bn/2008/02/the_list.html]
Under the most recent school consolidation plan proposed by acting superintendent [[Barbara Allen]] and approved by the Board, Wylam Elementary would accept students from [[A.G. Gaston K-8 School]] after the [[2011]] school year. [http://blog.al.com/bn/2008/02/the_list.html]
On [[December 9]], [[2008]] the Board of Education approved an $11.1 million contract with the [[Argo Building Company]] for a new Wylam K-8 School building.


[[Category:Birmingham schools]]
[[Category:Birmingham schools]]
Line 29: Line 31:
[[Category:1900 buildings]]
[[Category:1900 buildings]]
[[Category:1922 buildings]]
[[Category:1922 buildings]]
[[Category:2009 buildings]]
[[Category:David O. Whilldin buildings]]
[[Category:David O. Whilldin buildings]]
[[Category:Wylam]]
[[Category:Wylam]]

Revision as of 10:58, 10 December 2008

Wylam Elementary School
BCS small logo.png Birmingham City Schools
Years 1900present
Location 701 Erie Street Wylam, (map)
Wylam
Grades K-5
Principal Judith Ross
Enrollment 230 (2008)
Colors
Mascot
Website birmingham.schoolinsites.com

Wylam Elementary School is an elementary school in the Birmingham Public School System located at 701 Erie Street at the intersection of 7th Avenue in Wylam. The principal is Judith Ross.

The first Wylam School was constructed by the then-independent Town of Wylam in 1900. It was absorbed into the Birmingham system as part of the Greater Birmingham annexations of 1910. The present school building was constructed in 1922 to designs by architect David O. Whilldin.

Under the most recent school consolidation plan proposed by acting superintendent Barbara Allen and approved by the Board, Wylam Elementary would accept students from A.G. Gaston K-8 School after the 2011 school year. [1]

On December 9, 2008 the Board of Education approved an $11.1 million contract with the Argo Building Company for a new Wylam K-8 School building.