Jefferson Avenue Viaduct: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
m (Dystopos moved page Jefferson Avenue Southwest Viaduct to Jefferson Avenue Viaduct) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The '''Jefferson Avenue Viaduct''' is a bridge in Powderly, carrying traffic on [[Jefferson Avenue Southwest]] over the [[Southern Railway]]. The project was started in 1964. The viaduct features interchange-like access roads to ensure full access to [[24th Street Southwest]] below, which also crosses the railroad. | The '''Jefferson Avenue Viaduct''' or '''Jefferson Avenue Viaduct''' is a bridge in Powderly, carrying traffic on [[Jefferson Avenue Southwest]] over the [[Southern Railway]]. The $1,120,000 project was approved in [[1963]], funded from a $6 million bond issue for grade separations and sanitary sewers. One third of the cost was contributed by the federal Accelerated Public Works Program, with additional support from the [[Alabama State Highway Department]]. | ||
Work started in [[1964]]. The viaduct features interchange-like access roads to ensure full access to [[24th Street Southwest]] below, which also crosses the railroad. | |||
==References== | |||
* [http://bplonline.cdmhost.com/cdm/ref/collection/p4017coll2/id/21 Grade separation work begins at Powderly] (September 8, 1964) {{BN}} - via {{BPLDC}} | |||
==External Links== | ==External Links== | ||
{{Locate | lat=33.475840 | lon=-86.871743 }} | {{Locate | lat=33.475840 | lon=-86.871743 }} | ||
[[Category:Bridges]] | [[Category:Bridges]] | ||
[[Category:Jefferson Avenue|Viaduct]] | |||
[[Category:1964 buildings]] | [[Category:1964 buildings]] |
Latest revision as of 10:49, 1 April 2024
The Jefferson Avenue Viaduct or Jefferson Avenue Viaduct is a bridge in Powderly, carrying traffic on Jefferson Avenue Southwest over the Southern Railway. The $1,120,000 project was approved in 1963, funded from a $6 million bond issue for grade separations and sanitary sewers. One third of the cost was contributed by the federal Accelerated Public Works Program, with additional support from the Alabama State Highway Department.
Work started in 1964. The viaduct features interchange-like access roads to ensure full access to 24th Street Southwest below, which also crosses the railroad.
References
- Grade separation work begins at Powderly (September 8, 1964) The Birmingham News - via Birmingham Public Library Digital Collections