Clay Community Center: Difference between revisions
Jump to navigation
Jump to search
Patriarca12 (talk | contribs) No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
The '''Clay Community Center''' is located in [[Clay]] | The '''Clay Community Center''' is located in [[Clay]] at 6411 [[Clay-Palmerdale Road]], adjacent to the [[Center Point Fire District Station 4]]. The center was completed in August [[2006]] to serve as a replacement for an aging center demolished to make way for the new center. | ||
Designed by [[Thompson Architecture]] and constructed by [[B&B Construction]], the 4,400 square foot building took six months to complete at a cost of $437,000. The center features a large meeting room, two handicapped accessible restrooms, a small kitchen area and a storage room. The center is available for both public and private functions. | Designed by [[Thompson Architecture]] and constructed by [[B&B Construction]], the 4,400 square foot building took six months to complete at a cost of $437,000. The center features a large meeting room, two handicapped accessible restrooms, a small kitchen area and a storage room. The center is available for both public and private functions. | ||
The center was formally opened to the public on | The center was formally opened to the public on [[September 11]], 2006. | ||
==References== | ==References== | ||
Line 10: | Line 10: | ||
[[Category:Clay]] | [[Category:Clay]] | ||
[[Category:2006 buildings]] | [[Category:2006 buildings]] | ||
[[Category:Clay-Palmerdale Road]] |
Revision as of 16:25, 13 March 2008
The Clay Community Center is located in Clay at 6411 Clay-Palmerdale Road, adjacent to the Center Point Fire District Station 4. The center was completed in August 2006 to serve as a replacement for an aging center demolished to make way for the new center.
Designed by Thompson Architecture and constructed by B&B Construction, the 4,400 square foot building took six months to complete at a cost of $437,000. The center features a large meeting room, two handicapped accessible restrooms, a small kitchen area and a storage room. The center is available for both public and private functions.
The center was formally opened to the public on September 11, 2006.
References
- Debro, Anita (September 06, 2006) "Clay schedules open house for new community center". Birmingham News.